Environmental review document


Our Environmental Review Document (ERD) contains substantial data which is the result of seven years’ study into the direct project area, surrounding marine areas and the mangrove areas to the south of the project.

Ashburton Salt project’s Environmental Review Document is ready for the public to review and share their thoughts.

We encourage you to review our findings by downloading the ERD and its supporting documents.

To help you locate the information you are most interested in, we have provided summaries below with links to the relevant chapters.


APPENDICES

A. Marine and Coastal Assessment and Modelling

AA. BTAC Cultural Associations Consultation

B. Surface Water Assessment and Modelling

C. Marine, Coastal and Surface Water Data Collection

D. Marine, Coastal and Surface Water Existing Environment

DD Updated Artificial Light Monitoring and Modelling Report

E. Surface Water Assessment and Modelling

F. Peer Review of Coastal, Surface Water and Nutrient Pathway Modelling

G. Response to Sea Level Rise

H. Ashburton Salt Projection of Future Habitat Area

I. Seawater Intake Assessment

J. Nutrient Pathway Assessment and Modelling

K. ASSS Study

L. Phase 2 Ecotoxicology Assessment

M. Assessment of BCH

N. Marine Fauna Impact Assessment

O. Migratory Shorebird Assessment

P. Prawn Assessments

Q. Detailed Vegetation and Flora Survey

R. Targeted Flora Survey 2022

S. Level 2 Seasonal Fauna Survey

T. Claypan Ephemeral Fauna Desktop Review

U. Materials Characterisation Study

V. Groundwater modelling- updated results

W. Hydrogeological Investigation

X. Independent Review of Ashburton Salt Project Groundwater Modelling

Y. Groundwater Modelling Independent Review

Z. Aboriginal Heritage Study Report

BB. EMPs

ASSS MP

Dredging and Sediment MP

Fauna MP

Interim Mine Closure Plan

Introduced Marine Pest MMP

Marine Environmental Quality MMP

Marine Fauna MP

Waste MP

CC. Interim Offset Strategy

0360_K+S_ASH_OFS_DOC_Offsets Strategy_1_230530

Appendix 1 - DWER_WA_environmental_offsets_calculator_G to E vegetation.xlsm

Appendix 2 - DWER_WA_environmental_offsets_calculator_NQ POP.xlsm

Appendix 3 - EPBC Offset-assessment NQ POP2.pdf


sharing your feedback

The WA EPA will collect submissions about the project directly over a 12-week period.

Feedback submissions on the document can be made to the Department of Water and Environmental Regulation (DWER) in response to the project’s studies and research findings.

The EPA prefers submissions to be made electronically via the EPA’s Consultation Hub at: https://consultation.epa.wa.gov.au.

Following the Public Review Period, K+S will be required to respond to any submissions made during the public comment period, and provide additional information if required.

The EPA will then assess the proposal based on the relevant submissions and K+S' response to any submissions.

The Environmental Review Document including appendices is very long (more than 4,400 pages). K+S Salt Australia is subject to the same process as any other significant proposed project in the State. The EPA will assess the project on the scientific data and the adequacy of mitigation measures proposed to address potential impacts.